<?xml version="1.0" encoding="UTF-8"?>
<!-- Add each new post as a NEW <item> AT THE TOP of the list, and update
     <lastBuildDate>. pubDate must be RFC 822, e.g. "23 Mar 2026 12:00:00 GMT". -->
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
  <channel>
    <title>TerraPoint Insights</title>
    <link>https://www.terrapointenv.com/blog/</link>
    <atom:link href="https://www.terrapointenv.com/feed.xml" rel="self" type="application/rss+xml"/>
    <description>Regulatory analysis and field perspective on Edwards Aquifer permitting, karst geology, and environmental due diligence, from TerraPoint Environmental Consulting.</description>
    <language>en-us</language>
    <copyright>TerraPoint Environmental Consulting</copyright>
    <managingEditor>brian@terrapointenv.com (Brian Cowan, P.G.)</managingEditor>
    <lastBuildDate>11 Aug 2026 12:00:00 GMT</lastBuildDate>

    <item>
      <title>New TCEQ Rules Open the Door to Edwards Aquifer ASR Wells, and Raise Some Unresolved Questions</title>
      <link>https://www.terrapointenv.com/blog/tceq-edwards-aquifer-asr-wells</link>
      <guid isPermaLink="true">https://www.terrapointenv.com/blog/tceq-edwards-aquifer-asr-wells</guid>
      <pubDate>23 Mar 2026 12:00:00 GMT</pubDate>
      <description>SB 616 authorizes aquifer storage and recovery wells transecting the Edwards Aquifer in parts of Williamson and Medina Counties. The permitting pathway now exists; the recharge zone and endangered species questions underneath it do not have answers yet.</description>
    </item>

    <item>
      <title>How Do You Build a Bridge Over the Soul of a City?</title>
      <link>https://www.terrapointenv.com/blog/mopac-bridge-barton-springs</link>
      <guid isPermaLink="true">https://www.terrapointenv.com/blog/mopac-bridge-barton-springs</guid>
      <pubDate>14 Oct 2025 12:00:00 GMT</pubDate>
      <description>The MoPac Bicycle and Pedestrian Bridge over Austin's Edwards Aquifer recharge zone, where geology, endangered species, and Barton Springs hydrology are one system.</description>
    </item>

    <item>
      <title>Phase I ESAs: Your First Line of Defense Against Environmental Liability</title>
      <link>https://www.terrapointenv.com/blog/phase-i-esa-cercla-liability-defenses</link>
      <guid isPermaLink="true">https://www.terrapointenv.com/blog/phase-i-esa-cercla-liability-defenses</guid>
      <pubDate>16 Sep 2025 12:00:00 GMT</pubDate>
      <description>Under CERCLA you can be liable for contamination you did not cause. Three defenses exist, and every one requires a compliant Phase I ESA completed before acquisition.</description>
    </item>

    <item>
      <title>The Modern Karst Geologist: Blending Tradition, Tech, and Expertise for Success</title>
      <link>https://www.terrapointenv.com/blog/modern-karst-geologist</link>
      <guid isPermaLink="true">https://www.terrapointenv.com/blog/modern-karst-geologist</guid>
      <pubDate>09 Sep 2025 12:00:00 GMT</pubDate>
      <description>LiDAR, GIS, geophysics, and dye tracing have transformed what a karst geologist can see. None of them replace the trained eye. The skill is knowing which tool a question calls for.</description>
    </item>

    <item>
      <title>Why "Avoid and Minimize" Beats "Mitigate" Every Time</title>
      <link>https://www.terrapointenv.com/blog/avoid-and-minimize-beats-mitigate</link>
      <guid isPermaLink="true">https://www.terrapointenv.com/blog/avoid-and-minimize-beats-mitigate</guid>
      <pubDate>02 Sep 2025 12:00:00 GMT</pubDate>
      <description>Avoiding an impact during siting keeps the developer in control of the footprint and the narrative. Mitigating it during permitting hands that control to the agency.</description>
    </item>

    <item>
      <title>What I've Learned from 500+ Projects: A Field-Tested Playbook for Smooth Permitting</title>
      <link>https://www.terrapointenv.com/blog/500-projects-permitting-playbook</link>
      <guid isPermaLink="true">https://www.terrapointenv.com/blog/500-projects-permitting-playbook</guid>
      <pubDate>02 Sep 2025 11:00:00 GMT</pubDate>
      <description>Five rules from more than 500 environmental projects, each paired with a real miss and a real win.</description>
    </item>

    <item>
      <title>AI, Energy, and the Permitting Bottleneck: Why the U.S. Risks Falling Behind</title>
      <link>https://www.terrapointenv.com/blog/ai-energy-permitting-bottleneck</link>
      <guid isPermaLink="true">https://www.terrapointenv.com/blog/ai-energy-permitting-bottleneck</guid>
      <pubDate>19 Aug 2025 12:00:00 GMT</pubDate>
      <description>The AI race will be decided by data centers, and data centers are decided by megawatts, water, and permitting. Why environmental review belongs at the front of the strategy.</description>
    </item>

    <item>
      <title>Karst Doesn't Have to Mean Chaos</title>
      <link>https://www.terrapointenv.com/blog/karst-does-not-have-to-mean-chaos</link>
      <guid isPermaLink="true">https://www.terrapointenv.com/blog/karst-does-not-have-to-mean-chaos</guid>
      <pubDate>12 Aug 2025 12:00:00 GMT</pubDate>
      <description>What actually happens when a karst feature turns up mid-project, the early warning signs, and how to evaluate karst risk before it becomes a schedule problem.</description>
    </item>

    <item>
      <title>Uncovering Environmental Risks: Phase I Assessments Explained</title>
      <link>https://www.terrapointenv.com/blog/phase-i-assessments-explained</link>
      <guid isPermaLink="true">https://www.terrapointenv.com/blog/phase-i-assessments-explained</guid>
      <pubDate>21 Jul 2025 12:00:00 GMT</pubDate>
      <description>What a Phase I ESA actually involves, from historical research through the report, and the three CERCLA defenses it establishes for buyers and developers.</description>
    </item>

  </channel>
</rss>
